In order to safely convey all wastewater in Pebble Beach to the CAWD treatment plant, PBCSD maintains a sophisticated collections system including 80 miles of main sewer line and eight underground pump stations. The District has an extremely low incident of spills thanks to our very high standard of maintenance and our annual replacement of old sewer lines.

We have recently updated our Sewer System Management Plan (SSMP) which maps the entire system and describes all operations and maintenance activities performed. The plan complies with State Water Resources Control Board mandates, and allows us to evaluate the system as a whole so we can prioritize upcoming improvements.